View Single Post
Old 02-24-2007, 02:20 PM   #5
rjb2
Registered User
 
rjb2's Avatar
 
Join Date: Feb 2007
Location: Northern British Columbia Canada
Posts: 19
rjb2 is on a distinguished road


yep thats what I have in mind but am building mine so it has a locked fence and is locked to the table that way everything is repeatable without a pile of setup. my idea will have a sub base with attached fence that locks down on the able after i have got all setup and test peice cut and am happy will permenetly attach my UHMW to the phenolic make a pass past this and it will become a permenet setup jig attach my lockdown and peice of sand paper and should be able to mill rails and stiles repeatably and as many as i wish
rjb2 is offline   Top - Reply with Quote